BEFORE
BEFORE

I opened a section of wall to expose plumbing

AFTER
AFTER

Installed an access panel so the plumbing can easily be reached in cases of emergency.

BEFORE
BEFORE

I opened a section of wall to expose plumbing

1/2
BEFORE
BEFORE

Extensive damage to this powder room left a huge hole in the ceiling and peeling, warped plaster.

BEFORE
BEFORE

AFTER
AFTER

Finally a bathroom to be used again!

BEFORE
BEFORE

Extensive damage to this powder room left a huge hole in the ceiling and peeling, warped plaster.

1/5

Patchwork

Patch and Paint Job
Patch and Paint Job

BEFORE Tore out a lot of old plaster and rebuilt

Patch and Paint Job
Patch and Paint Job

AFTER Wow!

Patch and Paint Job
Patch and Paint Job

BEFORE Tore out a lot of old plaster and rebuilt

1/2
Garage Casing
Garage Casing

This board was rotted out so I replaced it

New Baseboards
New Baseboards

New Baseboards
New Baseboards

Garage Casing
Garage Casing

This board was rotted out so I replaced it

1/6

Trim