top of page
Patchwork
BEFORE
Extensive damage to this powder room left a huge hole in the ceiling and peeling, warped plaster.
BEFORE
AFTER
Finally a bathroom to be used again!
BEFORE
Extensive damage to this powder room left a huge hole in the ceiling and peeling, warped plaster.
1/5
BEFORE
I opened a section of wall to expose plumbing
AFTER
Installed an access panel so the plumbing can easily be reached in cases of emergency.
BEFORE
I opened a section of wall to expose plumbing
1/2
Patch and Paint Job
BEFORE Tore out a lot of old plaster and rebuilt
Patch and Paint Job
AFTER Wow!
Patch and Paint Job
BEFORE Tore out a lot of old plaster and rebuilt
1/2
Garage Casing
This board was rotted out so I replaced it
New Baseboards
New Baseboards
Garage Casing
This board was rotted out so I replaced it
1/6
Trim
bottom of page